{"id":1493,"date":"2025-08-06T01:34:39","date_gmt":"2025-08-06T01:34:39","guid":{"rendered":"https:\/\/albany-turbine.com\/?p=1493"},"modified":"2025-10-03T09:57:50","modified_gmt":"2025-10-03T09:57:50","slug":"repair-hgpi-cl-pt-pusri","status":"publish","type":"post","link":"https:\/\/albany-turbine.com\/index.php\/2025\/08\/06\/repair-hgpi-cl-pt-pusri\/","title":{"rendered":"Albany Sukses Repair Hot Gas Path Inspection &amp; CL PT. Pupuk Sriwidjaja Palembang"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><a><\/a><strong>Meningkatkan Keandalan Sistem Pembangkit melalui Perbaikan Hot Gas Path &amp; Combustion Liner<\/strong><\/h3>\n\n\n\n<p><strong>Klien: PT. Pupuk Sriwidjaja Palembang<br>Lokasi: Workshop PT. Albany Engineering Services<\/strong><br><strong>Periode Kerja: Januari \u2013 Juli 2025<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Repair Spare Part Hot Gas Path Inspection<\/em><em> (HGPI)<\/em><\/li>\n\n\n\n<li><em>Repair Combustion Liner F40 \u2013 4006 JT<\/em><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" src=\"https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/4.jpg\" alt=\"Repair Hot Gas Path Inspection &amp; Combustion Liner\" class=\"wp-image-1490\" srcset=\"https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/4.jpg 960w, https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/4-600x338.jpg 600w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><a><\/a><strong>Lingkup Pekerjaan Repair Hot Gas Path Inspection (HGPI)<\/strong><\/h3>\n\n\n\n<p>Dalam rangka mendukung efisiensi dan keandalan pembangkit turbin gas industri pupuk, Albany Engineering Services melaksanakan pekerjaan <strong>perbaikan spare part komponen hot gas path<\/strong> yang terdiri dari:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cross Fire Tube<\/li>\n\n\n\n<li>Fuel Nozzle<\/li>\n\n\n\n<li>Combustion Liner<\/li>\n\n\n\n<li>Transition Piece<\/li>\n\n\n\n<li>1<sup>st<\/sup> &amp; 2<sup>nd<\/sup> Stage Nozzle<\/li>\n<\/ul>\n\n\n\n<p>Proyek dimulai dari Bulan Januari 2025 sampai Bulan Juli 2025. Seluruh proses repair dilakukan di Workshop Albany dengan kontrol kualitas tinggi, dokumentasi detail, dan pengujian akhir melalui <em>joint final inspection<\/em> untuk hasil pekerjaan maksimal.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Dokumentasi Pekerjaan<\/h4>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" src=\"https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/2.jpg\" alt=\"Repair Hot Gas Path Inspection &amp; Combustion Liner\" class=\"wp-image-1488\" srcset=\"https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/2.jpg 960w, https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/2-600x338.jpg 600w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><figcaption class=\"wp-element-caption\">Gambar 1.1: Progress Repair Spare Part HGPI ex PT PUSRI<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" src=\"https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/3.jpg\" alt=\"Repair Hot Gas Path Inspection &amp; Combustion Liner\" class=\"wp-image-1489\" srcset=\"https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/3.jpg 960w, https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/3-600x338.jpg 600w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><figcaption class=\"wp-element-caption\">Gambar 1.2: Progress Repair Combustion Liner PT PUSRI<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><a><\/a><strong>Kenapa Repair Turbin Gas di Albany?<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Berpengalaman lebih dari 16 tahun<\/strong> dalam perbaikan komponen critical rotating equipment<\/li>\n\n\n\n<li>Workshop berfasilitas lengkap dengan <strong>precision machining, thermal spray, dan NDT<\/strong><\/li>\n\n\n\n<li>Ditangani oleh engineer dan teknisi bersertifikat dengan spesialisasi turbin industri<\/li>\n\n\n\n<li>Proses repair terdokumentasi dan traceable sesuai standar OEM &amp; EHS compliance<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><a><\/a><strong>Optimasi Operasional Pabrik Pupuk melalui Repair Hot Gas Path<\/strong><\/h3>\n\n\n\n<p>Kinerja turbin gas yang optimal sangat berperan penting dalam mendukung kontinuitas produksi pabrik pupuk berbasis gas alam seperti PT. Pupuk Sriwidjaja Palembang.<\/p>\n\n\n\n<p><strong>Perbaikan hot gas path <\/strong><strong>inspection <\/strong>&nbsp;adalah solusi strategis untuk mencegah downtime, menurunkan biaya penggantian suku cadang baru, serta memperpanjang umur pakai komponen kritikal.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><a><\/a><strong>Albany Jadi Mitra Strategis Industri Energi &amp; Pupuk<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" src=\"https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/5.jpg\" alt=\"albany\" class=\"wp-image-1491\" srcset=\"https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/5.jpg 960w, https:\/\/albany-turbine.com\/wp-content\/uploads\/2025\/08\/5-600x338.jpg 600w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<p>Dengan komitmen penuh terhadap kualitas dan presisi, <strong>Albany Engineering Services<\/strong> terus dipercaya dalam menangani <strong>repair turbin gas industri<\/strong> di berbagai sektor, mulai dari pembangkit listrik, pupuk, hingga petrokimia. Kami hadir sebagai partner strategis untuk solusi repair, overhaul, dan improvement berkelanjutan.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><a><\/a><strong>Ingin Perbaikan Turbin Gas Tepat Waktu dan Andal?<\/strong><\/h3>\n\n\n\n<p>Hubungi Albany Engineering Services hari ini untuk konsultasi teknis dan penawaran repair unit Anda. Kami siap mendukung kelangsungan produksi industri Anda melalui teknologi &amp; tenaga ahli bersertifikat.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Meningkatkan Keandalan Sistem Pembangkit melalui Perbaikan Hot Gas Path &amp; Combustion Liner Klien: PT. Pupuk Sriwidjaja PalembangLokasi: Workshop PT. Albany Engineering &#8230;<\/p>\n","protected":false},"author":1,"featured_media":1487,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,42],"tags":[],"class_list":["post-1493","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-our-work","category-projects-our-work"],"_links":{"self":[{"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/posts\/1493","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/comments?post=1493"}],"version-history":[{"count":1,"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/posts\/1493\/revisions"}],"predecessor-version":[{"id":1629,"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/posts\/1493\/revisions\/1629"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/media\/1487"}],"wp:attachment":[{"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/media?parent=1493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/categories?post=1493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/albany-turbine.com\/index.php\/wp-json\/wp\/v2\/tags?post=1493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}